NewEnergyNews More: UPGRADE TO LA GRID

Every day is Earthday.

Some details about NewEnergyNews and the man behind the curtain: Herman K. Trabish, Agua Dulce, CA., Doctor with my hands, Writer with my head, Student of New Energy and Human Experience with my heart

email: herman@NewEnergyNews.net

-------------------

Your intrepid reporter

-------------------

    A tip of the NewEnergyNews cap to Phillip Garcia for crucial assistance in the design implementation of this site. Thanks, Phillip.

-------------------

Pay a visit to the HARRY BOYKOFF page at Basketball Reference, sponsored by NewEnergyNews and Oil In Their Blood.

  • ---------------
  • Sunday, January 4, 2009

    UPGRADE TO LA GRID

    ABB Wins $87 Million Order in U.S. to Expand Capacity of HVDC Power Transmission System
    December 22, 2008 (Transmission & Distribution World via Power Engineering)

    "ABB has won an order worth $87 million to expand and strengthen the power transmission network in the area of Los Angeles, CA, so that it can deliver more electricity from renewable sources. Intermountain Power Agency (IPA) with the operating agent, Los Angeles Department of Water and Power (LADWP) has selected ABB to increase the capacity of the 22-year-old Intermountain Power Project Southern Transmission System (IPP STS) by 25 percent to 2,400 MW by 2010. The upgrade is part of LADWP"’s goal to bring 20 percent of power to customers from renewable energy sources by the end of the decade…The project implementation for LADWP will cause minimal disruption to existing services, with 75 percent of the system’s capacity being maintained during the refurbishment…”

    0 Comments:

    Post a Comment

    Note: Only a member of this blog may post a comment.

    << Home