NewEnergyNews More: POWER GIANT BUILDS TEX WIND PLANT

Every day is Earthday.

Some details about NewEnergyNews and the man behind the curtain: Herman K. Trabish, Agua Dulce, CA., Doctor with my hands, Writer with my head, Student of New Energy and Human Experience with my heart

email: herman@NewEnergyNews.net

-------------------

Your intrepid reporter

-------------------

    A tip of the NewEnergyNews cap to Phillip Garcia for crucial assistance in the design implementation of this site. Thanks, Phillip.

-------------------

Pay a visit to the HARRY BOYKOFF page at Basketball Reference, sponsored by NewEnergyNews and Oil In Their Blood.

  • ---------------
  • Monday, May 31, 2010

    POWER GIANT BUILDS TEX WIND PLANT

    Alstom Outlines Plans for North American Wind Turbine Assembly Facility
    May 25, 2010 (PR Newswire)

    "Alstom, a global leader in power generation…[announced] the opening of a wind turbine assembly facility that will create 275 full-time engineering, production, and technical support jobs in Amarillo, Texas…

    "…The [115,000 square foot] Amarillo facility will assemble the "nacelles"—i.e., the generator, gearbox, and control systems that make up a wind turbine. The nacelles will be transported from Amarillo to sites where they will be installed together with blades and towers to create the complete wind turbine generators. Alstom will offer its North American customers a product that includes any combination of the complete unit and the engineering, design, construction, and maintenance of the facility."


    Schematic of the Alstom nacelle (click to enlarge)

    "In particular, Alstom's offering includes the ECO 80/86 wind turbine platform (1.67 MW) and the ECO 100/110 wind turbine platform (3 MW) to accommodate the differing wind regimes across North America. All of Alstom's wind power offerings feature the ALSTOM PURE TORQUE™ design. ALSTOM PURE TORQUE™ is a unique rotor support concept protecting the gearbox and other drive train components from deflection loads, delivering higher gearbox reliability, higher operational availability, and lower maintenance costs…

    "Alstom has almost 30 years of experience in the wind power market with over 2,200 megawatts and 1,850 wind turbines in operation, primarily in Europe. Alstom's investment in Amarillo builds on the company's existing presence in the North America, where the company has 6,000 employees, multiple manufacturing sites, and a significant investment in other clean power solutions such as hydro, carbon capture and sequestration (CCS), nuclear, and energy efficiency."

    0 Comments:

    Post a Comment

    Note: Only a member of this blog may post a comment.

    << Home