NewEnergyNews More: BIG WIND TEST CENTER

Every day is Earthday.

Some details about NewEnergyNews and the man behind the curtain: Herman K. Trabish, Agua Dulce, CA., Doctor with my hands, Writer with my head, Student of New Energy and Human Experience with my heart

email: herman@NewEnergyNews.net

-------------------

Your intrepid reporter

-------------------

    A tip of the NewEnergyNews cap to Phillip Garcia for crucial assistance in the design implementation of this site. Thanks, Phillip.

-------------------

Pay a visit to the HARRY BOYKOFF page at Basketball Reference, sponsored by NewEnergyNews and Oil In Their Blood.

  • ---------------
  • Monday, May 14, 2012

    BIG WIND TEST CENTER

    Clemson Facility To Test Drivetrains For Wind Turbines In 5 MW To 15 MW Range

    10 May 2012 (North American Windpower)

    “….Engineers with Choate Construction will pour 750 cubic yards of concrete into a channel to form the 7.5 MW test rig foundation [for the Clemson University Wind Turbine Drivetrain Testing Facility]…

    “The pour marks a milestone for the massive construction project…[that] involves completely redeveloping an 82,000 square-foot warehouse on a former Navy base. The engineering design was performed by AEC Engineering in Minneapolis.”

    “In November 2009, Clemson and its partners were awarded a $45 million grant from the U.S. Department of Energy - which was combined with $53 million in matching funds - to build and operate the large-scale testing facility for next-generation wind turbine drivetrains.

    “When complete at the beginning of next year, the facility at the Clemson University Restoration Institute will have the capability for full-scale, highly accelerated testing of advanced drivetrain systems for wind turbines in the 5 MW to 15 MW range [with 50 Hz and 60 Hz testing capabilities]…”

    0 Comments:

    Post a Comment

    Note: Only a member of this blog may post a comment.

    << Home