NewEnergyNews More: UTILITY BUYS WIND AT $1.36MIL PER MW

Every day is Earthday.

Some details about NewEnergyNews and the man behind the curtain: Herman K. Trabish, Agua Dulce, CA., Doctor with my hands, Writer with my head, Student of New Energy and Human Experience with my heart

email: herman@NewEnergyNews.net

-------------------

Your intrepid reporter

-------------------

    A tip of the NewEnergyNews cap to Phillip Garcia for crucial assistance in the design implementation of this site. Thanks, Phillip.

-------------------

Pay a visit to the HARRY BOYKOFF page at Basketball Reference, sponsored by NewEnergyNews and Oil In Their Blood.

  • ---------------
  • Tuesday, January 8, 2013

    UTILITY BUYS WIND AT $1.36MIL PER MW

    Algonquin Power & Utilities Corp. Announces Acquisition of 109.5 MW Shady Oaks Wind Power Facility

    January 2, 2013 (Algonquin Power & Utilities Corp.)

    “Algonquin Power & Utilities Corp. ("APUC") (TSX: AQN)…has acquired a 109.5 MW contracted wind powered generating station ("Shady Oaks") from Goldwind International SO Limited ("Goldwind") for total consideration to all stakeholders of approximately US$148.9 million.

    “The Shady Oaks wind power facility is located in Northern Illinois…and reached commercial operation in June 2012. Total annual energy production is expected to be 364 GW-hrs per year. The Shady Oaks wind facility has entered into a 20 year inflation indexed power purchase agreement with the largest electric utility in the state of Illinois, Commonwealth Edison (BBB flat stable: Moody's, S&P)…”

    “The facility is comprised of 68 Goldwind GW82 1.5MW and 3 Goldwind GW100 2.5MW permanent magnet direct-drive wind turbines; these turbines are well suited for the wind regime, and offer significant technological advantages providing proven reliability, enhanced energy production efficiency and lower long term maintenance costs.

    “Through its affiliate, Goldwind has assumed all operations, maintenance, and capital repair responsibilities for the Shady Oaks wind facility pursuant to a 20 year fixed price agreement…”

    0 Comments:

    Post a Comment

    Note: Only a member of this blog may post a comment.

    << Home