NewEnergyNews More: ABOUT SAN ONOFRE’S WOES

Every day is Earthday.

Some details about NewEnergyNews and the man behind the curtain: Herman K. Trabish, Agua Dulce, CA., Doctor with my hands, Writer with my head, Student of New Energy and Human Experience with my heart

email: herman@NewEnergyNews.net

-------------------

Your intrepid reporter

-------------------

    A tip of the NewEnergyNews cap to Phillip Garcia for crucial assistance in the design implementation of this site. Thanks, Phillip.

-------------------

Pay a visit to the HARRY BOYKOFF page at Basketball Reference, sponsored by NewEnergyNews and Oil In Their Blood.

  • ---------------
  • Wednesday, May 16, 2012

    ABOUT SAN ONOFRE’S WOES

    San Onofre’s Steam Generator Failures Could Have Been Prevented Summary

    Arnie Gunderdsen, May 14, 2012 (Fairewinds Associates)

    “Southern California Edison’s four replacement steam generators at their San Onofre Nuclear Generating Station failed in less than two years of operation, while the original equipment operated for 28 years. Fairewinds has been analyzing the data in order to determine how such an expensive investment could fail so quickly.

    “In June of 2006 Edison informed the NRC that the replacement steam generators to be manufactured by Mitsubishi would be fabricated to the same design specifications as the original San Onofre Combustion Engineering (CE) steam generators. According to Nuclear Engineering International, Edison has admitted that this was a strategic decision to avoid a more thorough license amendment and review process…”

    “Fairewinds finds that there are numerous changes to the San Onofre steam generators that are not like-for-like…Furthermore, the facts reviewed by Fairewinds makes it clear that if Edison had informed the NRC that the new steam generators were not like-for-like, the more thorough NRC licensing review process would have likely identified the design problems before the steam generators were manufactured.

    “Finally, Fairewinds finds that tube plugging is not the solution to the vibration problem…and that the damaged steam generators will still require major modifications with repair and outage time that could last more than 18 months if Edison and Mitsubishi are even able to repair these faulty designed steam generators. However, Fairewinds finds that the safest long-term action is the replacement of the San Onofre steam generators…”

    0 Comments:

    Post a Comment

    Note: Only a member of this blog may post a comment.

    << Home